Trains
Track, stations, building a train, schedules, and how signals keep trains from colliding or deadlocking.
Applies to: ATM-10 8.6 · All the Mons 2.2.0
Track#
Click a track, then click where it should end, to lay it in bulk. Track can bend and slope. Sprint while placing for the longest bend that fits. Material held in the off-hand is paved under the track. One placement can be up to 32 blocks. Refusals such as “Turn too sharp” and “Slope too steep” mean you need a gentler path. read
Building a train#
- Place a station beside the track: select the track, then place the station nearby. It can only be approached from the direction it shows.
- Switch the station to Assembly Mode. Scheduled trains keep away from it while it’s in that mode.
- Put train casing on the track to make bogeys. Click again to change the type.
- Build the train on top, super glue it together, and add train controls. Add a second set facing the other way if it should leave stations in both directions. Controls can’t face sideways.
- Click Assemble at the station.
Limits: 128 blocks long and 20 bogeys by default. Top speed is 28 blocks/s, or 40 when fuelled: put fuel in a chest or barrel on board, because fuel in vaults isn’t used. read
Schedules#
Give a schedule to a conductor, “any mob or blaze burner sitting in front of Train Controls”. A schedule placed on a station copies itself to trains there. read
- Instructions: Travel to Station, Limit Max Speed, Update Title, Deliver Package, Retrieve Package.
- Conditions: Scheduled Delay, Time of Day, Item or Fluid Cargo, Cargo Inactivity, Players Seated, Station Powered, Redstone Link, Chunk Unloaded.
Station names accept * wildcards, so one schedule can serve several platforms.
unverified
Signals#
Signals divide track into segments, and “each Segment will contain only one Train at a time”. read
- Standard signal: “Allow passage if section unoccupied”.
- Brass (chain) signal: “Allow passage if section fully traversable”. It stops a train that couldn’t leave the next segment straight away. Toggle the type with a wrench.
- Scheduled trains never pass a signal from behind unless a second signal faces the other way. Two-way track needs signals in pairs.
- Redstone forces a signal red. Red signals give a comparator output.
- A signal, station or observer can’t sit on a junction. Crossing tracks are linked, so a train on one blocks the other.
The usual pattern is a brass signal into a junction and standard signals on its exits. A train then only enters the junction if it can get all the way through. Ponder: “Segments of a brass signal usually lead into standard signals”. The rest of the pattern is community practice. unverified
Trains and unloaded chunks#
Trains keep running through unloaded chunks, stopping at stations and red signals. But drills and other machines on board “will not operate” there. Postboxes still work. read
Sources: Ponder text, trains config, signal groups.