All the Mods Factory Guide
Trains

Trains

Track, stations, building a train, schedules, and how signals keep trains from colliding or deadlocking.

Applies to: ATM-10 8.6 · All the Mons 2.2.0

Track#

Click a track, then click where it should end, to lay it in bulk. Track can bend and slope. Sprint while placing for the longest bend that fits. Material held in the off-hand is paved under the track. One placement can be up to 32 blocks. Refusals such as “Turn too sharp” and “Slope too steep” mean you need a gentler path. read

Building a train#

  1. Place a station beside the track: select the track, then place the station nearby. It can only be approached from the direction it shows.
  2. Switch the station to Assembly Mode. Scheduled trains keep away from it while it’s in that mode.
  3. Put train casing on the track to make bogeys. Click again to change the type.
  4. Build the train on top, super glue it together, and add train controls. Add a second set facing the other way if it should leave stations in both directions. Controls can’t face sideways.
  5. Click Assemble at the station.

Limits: 128 blocks long and 20 bogeys by default. Top speed is 28 blocks/s, or 40 when fuelled: put fuel in a chest or barrel on board, because fuel in vaults isn’t used. read

Schedules#

Give a schedule to a conductor, “any mob or blaze burner sitting in front of Train Controls”. A schedule placed on a station copies itself to trains there. read

  • Instructions: Travel to Station, Limit Max Speed, Update Title, Deliver Package, Retrieve Package.
  • Conditions: Scheduled Delay, Time of Day, Item or Fluid Cargo, Cargo Inactivity, Players Seated, Station Powered, Redstone Link, Chunk Unloaded.

Station names accept * wildcards, so one schedule can serve several platforms. unverified

Signals#

Signals divide track into segments, and “each Segment will contain only one Train at a time”. read

  • Standard signal: “Allow passage if section unoccupied”.
  • Brass (chain) signal: “Allow passage if section fully traversable”. It stops a train that couldn’t leave the next segment straight away. Toggle the type with a wrench.
  • Scheduled trains never pass a signal from behind unless a second signal faces the other way. Two-way track needs signals in pairs.
  • Redstone forces a signal red. Red signals give a comparator output.
  • A signal, station or observer can’t sit on a junction. Crossing tracks are linked, so a train on one blocks the other.

standard signal

brass signal

standard signal

standard signal

Main line

Approach

Junction
segment

Exit to line 1

Exit to line 2

The usual pattern is a brass signal into a junction and standard signals on its exits. A train then only enters the junction if it can get all the way through. Ponder: “Segments of a brass signal usually lead into standard signals”. The rest of the pattern is community practice. unverified

Trains and unloaded chunks#

Trains keep running through unloaded chunks, stopping at stations and red signals. But drills and other machines on board “will not operate” there. Postboxes still work. read

Sources: Ponder text, trains config, signal groups.

3 min readLicence